เช่ารถเครน 300 ตัน งานหนักพิเศษ ภาคตะวันออก

300-Ton Crane Rental for Extra-Heavy Work, Eastern Thailand

An 80m+ boom for power plants, petrochemical work, large bridge structures and major factory shutdowns, with a heavy-lift engineering team and P.J.2-certified operators.

From฿6,000
✓ Complete P.J.2 ✓ Lifting Cert. Operator ✓ 24-Hour Service ✓ Critical Lift Plan
Max Lifting Capacity
300
Tons
Main Boom
80+
Meters
Lifting Height (Luffing Jib)
130
Meters
Max Reach
90-110
Meters

300-Ton Crane - A Heavy-Lift-Class Crane for Extra-Heavy Work

300-ton crane rental is an extra-large crane for heavy-lift work that a 100-ton crane cannot handle - mostly work in power plants, petrochemical plants, refineries, major shutdowns and river-crossing bridge construction. We serve Chonburi, Rayong and Chachoengsao, in good condition with a heavy-lift engineering team and specialist operators.

Crane Rental Rates — Daily / Monthly

Crane rental with operator, priced by capacity from 10 to 300 tons. Clear pricing before the job starts.

Rates cover crane rental with operator and exclude transport for 4-wheel cranes. Monthly rates assume fuel is supplied by the client. Final pricing may vary with distance, site conditions and duration.

See rates for all crane sizes →

Jobs Well Suited to a 300-Ton Crane

Major Plant Shutdown

Lifting giant columns, reactors, heat exchangers

Power Plants

Turbines, generators, boilers in combined-cycle plants

Petrochemical / Refineries

Vessels, towers, storage tanks 80-250 tons

River-Crossing Bridges

Lifting wide-span segmental box girders

Wind Turbines

Lifting blades and nacelle towers above 80 m

Offshore / Ports

Large modules, extra-heavy ship equipment

Crane Rental Rates

Capacity Per day Per month
Cranes 10 - 35 tons฿6,000฿85,000
Cranes 50 - 80 tons฿14,000฿180,000
Cranes 100 - 160 tons฿40,000฿450,000
Cranes 200 - 300 tonsAsk for price

How 300-Ton Crane Rental Pricing Works - Project-Based

Project-based pricing depends on the specific project - contact us 2-4 weeks in advance

Mobilization

Hauling the crane + counterweight + boom over 5-15 trips, taking 2-5 days

Set-up Time

Assembled on site over 1-3 days, with a trial lift before work begins

Project Duration

Continuous work of 5-30 days, or by the month

Heavy-Lift Documents

Critical Lift Plan + Method Statement + GBP analysis

300-Ton Crane Rental Process

1. Contact & Inquire
2. Free Site Visit
3. Quotation + Lifting Plan
4. Job Handover
รถเครนให้เช่า 2 คัน ยกตู้คอนเทนเนอร์ หน้างานภาคตะวันออก

300-Ton Crane Rental

Chonburi · Rayong · Eastern Thailand

Heavy lift · 80m+ boom · Lifting Plan + JSA · call for a quote

099-189-3231LINE: 0991893231รถเครนให้เช่าภาคตะวันออก.com
รถเครนยกติดตั้งโครงสร้างเหล็กโรงงาน ชลบุรี ระยอง
Call now Add LINE